Describe the Development Life Cycle Models with Respect to Project Planning
whatssapp

Product Detail

Describe the Development Life Cycle Models with Respect to Project Planning.

University  Amity blog
Service Type Assignment
Course
Semester
Short Name or Subject Code SYSTEM ANALYSIS & DESIGN
Product of Assignment (Amity blog)
Pattern Section A,B,C Wise
Price
Click to view price

SYSTEM ANALYSIS & DESIGN

ASSIGNMENT A:
Explain different categories of a system.

Describe the Development Life cycle models with respect to Project Planning.

Construct a system development program for your organization. Research how they analyzed their SYSTEM OF INTEREST (SOI), its OPERATING ENVIRONMENT, and respective system elements. How this analysis reflects in the SOI architecture?
Describe the Software cost estimation methods and guidelines.


Create your own Definitions of a system, based on the “system” Definitions.
Describe IT and Organizational Structures. 


For your organization, identify how following are related to the systems, product, or services it provides—
 Problem space(s)

Opportunity space(s)


Solution space(s)

Describe the following—

Project Communication
Project Development Phases


ASSIGNMENT B:  Case Study
Read the case study given below and answer the questions given at the end       
Rajesh is a do-it-yourself entrepreneur who built up his fortune in trading. He traded in anything and everything, and kept close control of every activity. That was how he had grown rich enough to indulge in his one dream — to build a college in his hometown. A college that would be at par to the ones in the better cities, the ones in which he could not study himself. Work started a year back and the buildings were coming along well. He himself did not use computers much and became hooked to the Internet and e-mail only recently. He was determined to provide a PC with Internet connectivity to every students and faculty member. He was currently engrossed in plans for the 100 - seated computer lab.What was confusing him was the choice of Internet connectivity. He had about a dozen quotes in front of him. Recommendations ranged from 64 kbps ISDN all the way to 1 Gbps leased line to Guwahati, which was almost 200 km away. Prices ranged from slightly under a lakh all the way up to Rs 25 lakh and beyond. He did not understand most of the equipment quoted — firewall, proxy server, cache appliance. Nor was he sure what the hidden costs were. Although it went against his very nature, he would have to identify a trustworthy consultant who would help him make sense of the whole thing.
In the context of the given case, what managerial issues need to be addressed by Rajesh? Why is it important for managers to be tech savvy?
 
What is the importance of a ‘systems consultant’ to an organization? What skills should he/she possess? 

Assignment C

----- is the most important factor of management information system.
System
Output
Element
All of the above
Types of system are—
Physical systems
Abstract systems
Open system
all of the above
A close system is a—
System which has limited shape.
System which is rigid and mathematical
Both a & b
None of the above
Characteristics of a system—
Has certain objective and goal.
Does not operate in isolation.
Both a & b
None of the above
Attributes of DSS are—
Flexibility.
Simple model.
Both a&b.
None of the above
Structured decisions are—
Decision making on students’ result
Decision about payroll systems.
Both a&b.
None of the above
Unstructured decision example—
Production scheduling.
Capital budgeting.
Both a&b.
None of the above
System objective are –
To maintain the company’s share in the market.
To increase the net profits of the company.
To maintain the current efficiency.
All of above.
Integrated dictionary is related to a—
Database.
Database management sys.
Meta data.
None of above.
VTOC means—
Visual table of contents.
Input process output.
Both a&b.
None of the above
Database is a collection of _______ & its relation to each other and refers to the __________ of layer or coverage in space defined by co-ordinate referencing system.
Information, location
Spatially referenced, location
Information, geo-referencing
None
GIS data is either ________ data or ________ data.
Spatial, attribute
Spatial, dynamic
Domain, dynamic
Domain, attribute
Statistics is the set of mathematical methods used to _______ & __________ data.
Collect, analyze
Censuses, track
Both a&b.
None of the above
What is an open system is that—
       (1)   Interacts with the environment constantly.
            (2)  Has an infinite scope in all organization services
            (3)   Does not interact with the environment constantly.  
            (4)   Is generally flexible and abstract.
1,2,3,4
1, 2, 4
2, 3, 4
1, 3, 4

A data dictionary has consolidated list of data contained in—
(1)   Data flows.
(2)   Data stores.
(3)   Data outputs.
(4)   Processes.
(1) and (3)
(1) and (2)
(3) and (4)
(1) and (4)
A data dictionary is useful as—
(1)   A documentation aid.
(2)   Support in designing input forms.
(3)   Data in an application including temporary data used in processes.
(4)   A good idea in system design. 
(1) and (2)
(1) and (4)
(1) , (2) and (3)
(1) and (3)
Which of the following model is used as frame work?
Waterfall model.
Spiral model
Both a&b
None
Which of the following model is well suited for requirement change?
Waterfall model
Spiral model
Both a&b
All of the above
What is integration testing?
Integrating all modules
Integrating all function of a module
Both a&b
All of the above
What is information?
Meaningful data.
Row data
Dynamic Data
All of the above
Strategic information is used by—
Top level
Middle level
Both a&b
All of the above
Technical information is used by—
Top level
Middle level
Both a&b
None  of the above
Operational information is used by—
Top level
Middle level
Both a&b
All of the above
Integrated dictionary is related to a—
Database
Database management sys.
Mete data
None
A data element in a data dictionary may have—
Only integer value.
No value.
Only real value
Only decimal value
The major problems encountered in off-line data entry are—
(1)   Data are entered by operators.
(2)   Data entered by hand in forms - batch and forms may be missed or misread.
(3)   Errors are detected after a lapse of time.
  (4)   Data are entered by users. 

(1) and (2)
(1) and (3)
(2) and (3)
(3) and (4)
In interactive data input terminal commands are normally used to—
Enter new data.
Add/Delete Data.
Select one out of many alternatives often by a mouse click.
Detect errors in data input.

By the term “concise code” we understand that the code—
Conveys information on item being coded.
Is of small in length.
Can add new item easily.
Includes all relevant characteristics of item being coded.

Serial numbers used as codes are—
1)   Concise.
(2)   Meaningful.
(3)   Expandable.
(4)   Comprehensive. 
(1) and (2)
(2) and (3)
(2) and (4)
(1) and (3)
Group classification codes are—
1)   Concise.
(2)   Meaningful.
(3)   Expandable.
(4)   Comprehensive. 
(1) and (2)
(1), (2) and (3)
(2), (3) and (4)
(1), (2) and (4)
For modulus-11 check digit to detect a single transposition error—
Weights should be distinct.
Weights may be equal and > 0.
Weights may be equal and > 0. (c.) Weights should be less than 0.
Weights should be > 0 and distinct.
If a field is known to represent days of a month, radix used to check should be—
30
31
28
29
I O controls includes—
Process schedules
Dispatching (report) details
Machine operations
a&b
Machine operations include—
System flow
Detailed instruction
JCL listing
All
Which is not an implementation component?
Hardware installation
Testing
Both
None
System Evaluation component are—
Internal controls.
Deficiencies.
Recommendation.
All 
Which of the following is not a tool for application proto-typing?
Third generation language
Report generator
Screen generator
Application generator.

The records in a file on magnetic tap—
Have to be arranged in a key sequence
Can only be accessed serially
One for backup
Can not be transferred to disk file.
Which of the following is not considered a tool at the system design phase?
Data Flow Diagram
Decision table
System flow chart
Pie chart.
In proto-typing the following are used—
Screen generator
Input generator
Application generator
All of the above