image

Solution of Assignment Synopsis & Project Dissertation Report


Note: ⇩    Fill the Name, Email and Mobile to get unlock the priclist...!!!!



Online-Typing-and-Filling

Title Name Software Engineering Solved Assignment for Amity better grades and marks in Delhi Noida Mumbai Faridabad and Ghaziabad India
University AMITY
Service Type Assignment
Course B.C.A
Semester Semester-IV Course: B.C.A
Session
Short Name or Subject Code Software Engineering
Commerce line item Type Semester-IV Course: B.C.A
Product Assignment of B.C.A Semester-IV (AMITY)
Price

PRICE INR

Click to View Price
Download Question File
Download Answer File 598823476512.docx (Purchase the product for download...!!!)

Questions:-


Software Engineering

  

Assignment A

Answer any five of the questions below.

1. What do you understand by the term Software Development Life Cycle? Why is it important to adhere to a life cycle model while developing a large software system?

  1. Write short note

(a)    Software Cost Estimation

(b)   Team Structure

  1. What do you understand by software project scheduling? Write down the software project scheduling techniques.
  2. Explain on the following:

(a)    Problem partitioning

(b)   Abstraction

  1. What is software design? Discuss the design principles in detail. 
  1. Explain why a design with low coupling helps maintainability
  2. What do you mean by software maintenance? Explain the maintenance tools in details in details.
  3. Discuss the differences in the following:

(a) Top-down and bottom-up

(b) Black box and white box testing

    

Assignment B

Case Detail: 

  1. Read the case study given below and answer the question given therein

Case Study

 Consider a program for determining the previous date. Its input is a triple of day, month and year with the values in the range

1 ≤ month ≤ 12

1 ≤ day ≤ 31

1900 ≤ year ≤ 2025

  1. The possible outputs would be previous date or invalid input date. Design the boundary value test cases.

 Assignment C

Question No.  1           Marks – 10  

Two basic issues for software engineering are-- 

Options          

  1. Engineering-design
  2. Hardware-software
  3. Software quality-cost
  4. None

Question No.  2           Marks - 10

Costliest phase of software development is-- 

Options          

  1. Testing
  2. Coding
  3. Analyzing
  4. None

Question No.  3           Marks - 10

An example of an expert system is--

Options          

  1. The internist
  2. A stock and bond analyze
  3. Structural analyze
  4. None

Question No.  4           Marks - 10

A virtual interface that--

Options          

  1. Is easy for programmer
  2. Is similar to doing traditional computer programming
  3. Does not allow user to take shortcuts
  4. None

Question No.  5           Marks - 10

The screen displays produced by a prototyping software package--

Options          

  1. Are the output produced by complete system program
  2. May closely model the output that may produced by system program
  3. Discourage user
  4. None

Question No.  6           Marks - 10

The following is not normally used during System Design- 

Options          

  1. Program review
  2. Working prototype
  3. Standard manual
  4. None of the above

Question No.  7           Marks - 10

Approach used in top-down analyzes and design--    

Options          

  1. Identify a top- level function and then create a hierarchy of lower level modules and component
  2. To prepare flowchart.
  3. All
  4. None of the above

Question No.  8           Marks - 10

During the data gathering phase of system analysis--                      

Options          

  1. Problem flowchart are often prepared
  2. System design specification are outlined
  3. Number of specialized forms may be prepared
  4. None

Question No.  9           Marks - 10

First step of implementation phase is-- 

Options          

  1. Select computer
  2. Implementation planning
  3. Prepare physical facilities
  4. None

Question No.  10         Marks - 10

A programmer would most likely prepare a 

Options          

  1. General system flowchart
  2. Specific system flowchart
  3. General program flowchart
  4. Specific program flowchart

Question No.  11         Marks - 10

Implementation of project proposal is prepared by-- 

Options          

  1. The executive vice-president and manager
  2. Vice president of information system
  3. System analyst guidance of vice-president of information system
  4. None

Question No.  12         Marks - 10

Design specification does not normally include-- 

Options          

  1. Output requirement
  2. Input requirement
  3. Control provision
  4. None

Question No.  13         Marks - 10

Some firms have created a combination position called-- 

Options          

  1. Analyst/manager
  2. Manager/operator
  3. Analyst/programmer
  4. None of above

Question No.  14         Marks - 10

During the system study, vice-president and manager do the-- 

Options          

  1. Planning
  2. Directing
  3. Controlling
  4. None of above

Question No.  15         Marks - 10

In token count N=N1+N2, where N1 is--      

Options          

  1. Unique operator
  2. Unique operand
  3. Occurrence of operator
  4. None

Question No.  16         Marks - 10

Features of function point are--

 Options          

  1. Average ,low, high
  2. Average
  3. High
  4. None

Question No.  17         Marks - 10

In function point function units are--: 

Options          

  1. 5
  2. 4
  3. 6
  4. 3

Question No.  18         Marks - 10

Risk management is of --------- types. 

Options          

  1. List of potential risk
  2. Prioritized list of risk
  3. Risk avoidance
  4. Risk assessment

Question No.  19         Marks - 10

Organic COCOMO model have range of-     

Options          

  1. 0-50 kloc
  2. 50-300 kloc
  3. Over 300 kloc
  4. None

Question No.  20         Marks - 10

In Waterfall model user involvement is in-- 

Options          

  1. All phases
  2. Some phases
  3. Not involved
  4. None

Question No.  21         Marks - 10

In Planning we include-- 

Options          

  1. What is to be done
  2. How is to be done
  3. By whom is to be done
  4. None

Question No.  22         Marks - 10

Which SDLC includes Risk? 

Options          

  1. Spiral model
  2. Waterfall model
  3. Iterative model
  4. None

Question No.  23         Marks - 10

Design type are-- 

Options          

  1. Conceptual design
  2. Technical design
  3. Both
  4. none of the above

Question No.  24         Marks - 10

AMC stands for-- 

Options          

  1. Annual maintenance cost
  2. Annual manage effort
  3. Development effort
  4. None of above

Question No.  25         Marks - 10

In Token count total length is equal to-- 

Options          

  1. n= n1+n2
  2. n2= n1+n3
  3. n=n1/n2
  4. none

Question No.  26         Marks - 10

Average Staff is calculated on the basis of-- 

Options          

  1. Effort
  2. Development
  3. Effort/development
  4. None

Question No.  27         Marks - 10

Risk Analysis means--

Options          

  1. Evaluate probability
  2. Probability ranges
  3. Both
  4. None of these

Question No.  28         Marks - 10

Software Engineering means-- 

Options          

  1. Making software
  2. Manufacturing software
  3. Developing software
  4. None

Question No.  29         Marks - 10

Software is easy to change, this statement is--           

Options          

  1. True
  2. Myth
  3. Hypothetical
  4. None of above

Question No.  30         Marks - 10

Which one is maintenance model?      

Options          

  1. CMM
  2. Quick fix model
  3. Iterative model
  4. None

Question No.  31         Marks - 10

In which model fixes are done without detailed analyses of the long term effects? 

Options          

  1. Reuse enhancement model
  2. Quick- fix model
  3. Taute model
  4. None of the above

Question No.  32         Marks - 10

Iterative enhancement model has-- 

Options          

  1. 3 stages
  2. 6 stages
  3. 4 stages
  4. None of the above

Question No.  33         Marks - 10

Taute maintenance model has-- 

Options          

  1. 2 phase
  2. 4 phases
  3. 5phasea
  4. 10 phases

Question No.  34         Marks - 10

In Bohem model ,ACT stands for-- 

Options          

  1. Actual change time
  2. Annual change time
  3. Actual change traffic
  4. Annual change time

Question No.  35         Marks - 10

Regression testing is known as-- 

Options          

  1. The process of retesting the modified parts of software
  2. Process of testing the design document
  3. Review the SRS
  4. None of these

Question No.  36         Marks - 10

Regression testing is related to-- 

Options          

  1. Maintenance of software
  2. Development of software
  3. Both
  4. None

Question No.  37         Marks - 10

Legacy system is--                  

Options          

  1. Old system
  2. New system
  3. Undeveloped
  4. None of the above

Question No.  38         Marks - 10

User Documentation consist of-- 

Options          

  1. Beginner’s guide
  2. Installation guide
  3. Reference guide
  4. None of the above

Question No.  39         Marks - 10

Which one is not user documentation?          

 Options          

  1. Beginner’s guide
  2. Installation guide
  3. SRS
  4. None

Question No.  40         Marks - 10

Which one is not user documentation?             

Options          

  1. Beginner’s guide
  2. Installation guide
  3. SRS
  4. None


Questions:-



Only after making the payment you would be able to see the answer...!!!

Review

Average user rating

4.8 / 5

Rating breakdown

5
80% Complete (danger)
1
4
80% Complete (danger)
1
3
80% Complete (danger)
0
2
80% Complete (danger)
0
1
80% Complete (danger)
0

January 29, 2015
This was nice in buy
Assignment from solve zone is probably one of the first preference of students.

January 29, 2015
This was nice in buy
Assignment from solve zone is probably one of the first preference of students.

09-Apr, 2018
This was nice in buy
Assignment from solve zone is probably one of the first preference of students.